Construction Project Scheduling and Control, 3/e
暫譯: 營造專案排程與管控(第 3 版)

Saleh A. Mubarak

相關主題

商品描述

Bad scheduling can doom a construction project from thestart

Construction Project Scheduling and Control provides acomprehensive examination of the analytical methods used to devisea reasonable, efficient, and successful schedule for constructionprojects of all sizes. This updated third edition contains newinformation on building image modeling (BIM) and its relationshipto project scheduling and control, as well as thorough coverage ofthe latest developments in the field. Written by a careerconstruction professional, this informative text introducesstudents to new concepts in CPM scheduling, including the author'sown Dynamic Minimum Lag technique. The expanded glossary andacronym list facilitate complete understanding, and the numeroussolved and unsolved problems help students test their knowledge andapply critical thinking to issues in construction scheduling. Acomplete instructor's manual provides solutions to all problems inthe book, test questions for each chapter, and additional examquestions for more comprehensive testing.

The entire success of a construction process hinges on anefficient, well-thought out schedule, which is strictly definedwhile allowing for inevitable delays and changes. This book helpsstudents learn the processes, tools, and techniques used to makeprojects run smoothly, with expert guidance toward the realities ofthis complex function.

  • Discover realistic scheduling solutions and cutting edgemethods
  • Learn the duties, responsibilities, and techniques of projectcontrol
  • Get up to date on the latest in sustainability, BIM, and leanconstruction
  • Explore the software tools that help coordinate scheduling

Scheduling encompasses everything from staff requirements andequipment needs to materials delivery and inspections, requiring adeep understanding of the process. For the student interested inconstruction management, Construction Project Scheduling andControl is an informative text on the field's current bestpractices.

商品描述(中文翻譯)

糟糕的排程可能從一開始就注定建設專案失敗

《Construction Project Scheduling and Control》全面探討如何運用分析方法,為各種規模的建設專案制定合理、高效且成功的排程。本次更新的第三版新增建築資訊模型(BIM)及其與專案排程和控制之關係的相關資訊,並完整涵蓋此領域的最新發展。本書由一位職業建設專業人士撰寫,將介紹施工管理相關的新概念,包括作者自行 разработ發的 Dynamic Minimum Lag 技術。擴充後的術語表與縮略語清單有助於讀者完整理解內容;書中大量已解與未解問題,則能協助學生檢驗所學,並針對建設排程中的各項議題培養批判性思考能力。完整的教師手冊提供書中所有問題的解答、各章測驗題,以及更多可用於全面評量的考題。

建設流程的整體成敗,取決於高效率且經過周詳規劃的排程;這份排程必須在嚴謹定義的同時,也為不可避免的延遲與變更保留彈性。本書將協助學生學習讓專案順利執行所需的流程、工具與技術,並在專家的引導下了解這項複雜工作的實際情況。

• 探索務實的排程解決方案與尖端方法
• 學習專案控制的職責、責任與技術
• 掌握永續性、BIM 與精實建築的最新發展
• 探索協助協調排程的軟體工具

排程涵蓋從人力需求、設備需求,到材料交付與檢查等各個面向,因此需要深入理解整個流程。對有志於從事建設管理的學生而言,《Construction Project Scheduling and Control》是一本介紹該領域當前最佳實務的重要教材。